Installation and Precautions of Lifting Column


Release time:

2022-05-14

Lifting column as some of the main places of maintenance equipment, more and more loved by everyone, then the lifting column is how to install the lifting column need to pay attention to what.

Lifting column as some of the main places of maintenance equipment, more and more loved by everyone, then the lifting column is how to install the lifting column need to pay attention to what.

 

升降柱安装


Installation method of electric lifting column installation


The first step: electric lifting column according to customer requirements planning electric lifting column, control cabinet installation location;


Step 2: Excavate the foundation, and the size is shown in the figure. Number of electric lifting columns;


Step 3: Embed the PVC pipe to the sewer and pour the concrete. The schematic diagram is as follows;


Step 4: After the bottom concrete is dry, put it into the foundation box, arrange the "wire" PVC pipe and connect it with the control cabinet;


Step 5: pour concrete around the outside of the foundation box. After the concrete is dry, thread the wires and make signs at both ends of the wires to prevent the wrong connection of the wires;


Step 6: Hoist the electric lifting column movement, and pay attention to the position of the electric lifting column wire connector on the same side as the PVC pipe.

 

Step 7: Install the electric lifting column control cabinet, connect the electric lifting column control cabinet line, and test the machine, refer to the controller manual. Note: PVC pipe must be connected to the municipal sewer, such as the drain pipe can not pass through the sewer, the user in the installation of the lifting column, should be dug beside the drainage well, to ensure that the drainage well at least 5L/min.


Precautions for installation of electric lifting column:


1. Users should regularly clean up the sediment in the electric lifting column drainage well to prevent the pump from being blocked and buried by sediment.


2. Keep a gap of about 1~2mm between the electric lifting column panel and the road surface to facilitate future maintenance or overhaul.

 

 

 

HebeiQi XinlongIntelligent Technology Co., Ltd. is a research and development, design, production, sales and service in one of the anti-terrorism equipment manufacturers. Main products include: automatic lifting column, semi-automatic lifting column, landscape fixed column, flap barricade, tire breaker, etc. Tel: 15531750999.

Key words:

Installation-Lifting Column


©2022 Hebei Qi Xinlong Intelligent Technology Co., Ltd. All Rights Reserved