What is the use of installing lifting columns in pedestrian streets?
Release time:
2022-07-05
Lifting column as some of the main places of maintenance equipment, it is easy to see in the pedestrian street, then what is the use of the pedestrian street to install the lifting column.
Lifting column as some of the main places of maintenance equipment, it is easy to see in the pedestrian street, then what is the use of the pedestrian street to install the lifting column.
The lifting column is installed at the intersection of the pedestrian street. The roadblock is usually in a raised state to restrict the entry and exit of vehicles. In case of emergency or special circumstances (such as fire, first aid, leader inspection, etc.), the roadblock can be quickly lowered to facilitate the passage of vehicles.
Road isolation zone: in the non-fully enclosed road isolation zone, lifting barricades can be used to prevent vehicles from turning left or turning around at ordinary times. In case of road construction, road congestion and other special circumstances, roadblocks can be lowered to divert vehicles.
At present, the use of the lifting column in the pedestrian street has shown a popular trend, I believe that soon, all the pedestrian street can see the figure of the lifting column.

Lifting column installation method
The first step:Lifting columnPlan the installation position of lifting column and control cabinet according to customer requirements;
Step 2: Excavate the foundation, the size is as shown in the figure parameter lifting column quantity;
Step 3: Embed the PVC pipe to the sewer and pour the concrete. The schematic diagram is as follows;
Step 4: After the bottom concrete is dry, put it into the foundation box, arrange the "wire" PVC pipe and connect it with the control cabinet;
Step 5: pour concrete around the outside of the foundation box. After the concrete is dry, thread the wires and make signs at both ends of the wires to prevent the wrong connection of the wires;
Step 6: Hoist the lifting column movement, and pay attention to the position of the lifting column wire connector on the same side as the PVC pipe.
Step 7: Install the lifting column control cabinet, connect the lifting column control cabinet line, and test the machine, refer to the controller manual. Note: PVC pipe must be connected to the municipal sewer, such as the drain pipe can not pass through the sewer, the user in the installation of the lifting column, should be dug beside the drainage well, to ensure that the drainage well at least 5L/min.
Lifting column installation note:
1. Users should regularly clean up the sediment in the lifting column drainage well to prevent the pump from being blocked and buried by sediment.
2. The gap between the lifting column panel and the road surface is about 1~2mm to facilitate future maintenance or overhaul.
Hebei Qi Xinlong Intelligent Technology Co., Ltd. is a research and development, design, production, sales and service in one of the anti-terrorism equipment manufacturers. Main products include: automatic lifting column, semi-automatic lifting column, landscape fixed column, flap barricade, tire breaker, etc. Tel: 15531750999.
Key words:
Pedestrian Street Lifting Column