How to install anti-terrorism barricade machine


Release time:

2023-06-22

Anti-terrorist roadblock machine as some of the main places of maintenance equipment, more and more loved by everyone. How to install the anti-terrorism barricade machine? The following is a good answer for everyone.

Anti-terrorist roadblock machine as some of the main places of maintenance equipment, more and more loved by everyone. How to install the anti-terrorism barricade machine? The following is a good answer for everyone.

 

反恐路障机安装


1. When installing, the barrier frame should be pre-buried in the location to be installed. Attention should be paid to the level between the barrier frame and the ground (barrier height is 780mm). The distance between the barricades and the roadblocks is less than 1.5 meters.
2. When wiring, first determine the position of the hydraulic station and the control box, and place 1 × 2cm between the main frame and the hydraulic station; there are two sets of lines between the hydraulic station and the control box, one of which is 2 × 0.6. The other group is 3 × 2, and the input voltage is 380V/220V.
3. Square grooves (3500mm × 1400mm in width × 1000mm in depth) are dug at the entrance and exit of the vehicle specified by the user to fit the main frame of the road obstacle (the size of the groove installed on the obstacle) 3 meters).
4. Fill the bottom of the groove with 220mm high clay, which requires high precision (the bottom of the barrier frame can touch the bottom of the clay face so that the whole frame can withstand the pressure), and the lower part of the middle groove, leaving a small drain pipe (200mm x 100mm wide) for drainage.
5. Using manual drainage or electric pumping mode, it is necessary to dig a small pond near the column, regularly manual and electric drainage, using natural drainage mode, directly connected to the sewer.
6. The main frame is installed on the designated lane. According to the actual situation on site, the hydraulic station is installed in a suitable location for easy operation and maintenance, as close as possible to the rack (indoor and outdoor). The control box is placed in a location that is easy to control according to customer requirements (operator desktop).
7. After connecting the hydraulic pipeline, the sensor and control line are completed, and the subsequent work can only be completed after checking again and confirming that there are no errors.
8. Start the motor idling and check whether the motor rotates in the correct direction. If not, replace the three-phase access line. The next step is normal.
9. Add hydraulic oil and check whether the oil level displayed in the oil level gauge is higher than the central oil level.
10. The start control is pressed and turned to perform the on-off debugging of the anti-terrorism roadblock machine. The switching interval should be longer during debugging, and pay attention to the normal opening and closing of the movable turntable of the anti-terrorism roadblock machine. After repeating several times, observe whether the oil level indication on the hydraulic oil tank is in the middle of the oil level gauge and fill up as soon as possible.
11. When debugging the hydraulic system, pay attention to the change of the oil volume of the oil pressure gauge.










 

 

 

Hebei Qi Xinlong Intelligent Technology Co., Ltd. is a lifting column manufacturer integrating R & D, design, production, sales and service. Main products include: automatic lifting column, semi-automatic lifting column, hydraulic lifting column, landscape fixed column,Hydraulic flap barricade, tire breaker, etc. Tel: 15531750999.