What are the installation skills of hydraulic lifting column


Release time:

2023-08-23

Hydraulic lifting column as some of the main places of maintenance equipment, more and more loved by everyone. What are the installation skills of hydraulic lifting column? The following lifting column manufacturer Qi Xinlong gives you a good answer.

Hydraulic lifting column as some of the main places of maintenance equipment, more and more loved by everyone. What are the installation skills of hydraulic lifting column? The following lifting column manufacturer Qi Xinlong gives you a good answer.

 

液压升降柱安装技巧


1. Safety precautions.
The construction area shall be closed by fences and other facilities, and warning signs shall be set up in front of intersections to prevent pedestrians and vehicles from entering the construction area. Ensure the safety of the building.
2. Foundation mining.
In the slotted part, pavers and electric hammers will destroy the original pavement of the slotted part (for example, the original pavement is floor tiles or stone steps to avoid damaging the original materials), and then use picks and shovels together with excavators to dig to a depth of 1.3 meters below the ground. A 1-meter-long and 1-meter-wide well was dug next to the foundation at a depth of 2 meters.
Basic production.
According to the requirements of the drawings, the foundation pit shall be excavated, the bottom plate shall be tamped, concrete shall be paved, and the drainage board 1.1m above the ground shall be laid. And set up a collection well to collect rainwater, to ensure that the equipment is not soaked in water, to ensure the service life and beauty of the equipment.
4. Install the hanging column.
When the foundation according to the drawing design requirements to do a good job of theoretical basis, with the help of pull wire, horizontal tube, level and other tools to adjust the position of the lifting column, to ensure that the top surface of the lifting column and the ground level, and all of our lifting column height development consistent. In the horizontal direction, to ensure the enterprise ground service level, a gentle slope can be carried out between the lifting column top and the ground environment.
5. Electrical connections.
Lay one PVC32 pipe (<1 RVV7 * 2.5) from each lifting column to the control cabinet mounting position and connect the ends of the lifting columns. The top surface of PVC pipe is not less than 30m from the ground. When large vehicles frequently pass through the tunnel, the pipeline can be laid with galvanized steel sheet.
6. Backfill concrete.
After the boom is installed, concrete below grade C25 shall be used for filling operation according to requirements. During the process, the boom will be pulped and vibrated with vibration.
7. Control box connection.
The control room and lifting column are connected as shown in the guide.
8. Road rehabilitation works.
Use these original pavement materials to repair. You can also use a concrete pouring to the ground after analysis.















 

 

 

Hebei Qi Xinlong Intelligent Technology Co., Ltd. is a lifting column manufacturer integrating R & D, design, production, sales and service. Main products include: automatic lifting column, semi-automatic lifting column,Hydraulic lifting columnLandscape fixed column, flap barricade, tire breaker, etc. Tel: 15531750999.

Key words:

Installation skills of hydraulic lifting column


©2022 Hebei Qi Xinlong Intelligent Technology Co., Ltd. All Rights Reserved