Installation process of automatic lifting column


Release time:

2024-01-24

Automatic lifting column as some of the maintenance equipment of many units, more and more loved by everyone, automatic lifting column installation process is what.

Automatic lifting column as some of the maintenance equipment of many units, more and more loved by everyone, automatic lifting column installation process is what.

 

全自动升降柱安装


The installation of 1. automatic lifting column requires some preparation work. When choosing the installation location, it is necessary to consider factors such as road width, traffic flow, emergency traffic, etc., and at the same time fully consider safety and aesthetics, and meet the requirements of road traffic management. After determining the installation location, it is necessary to conduct geological surveys and measurements to determine the installation height and depth to ensure the installation accuracy and stability of the lifting column.
2. before the installation of automatic lifting column, the need for field wiring and grounding treatment. When wiring the circuit, it is necessary to design and arrange the cable circuit according to the electrical parameters of the lifting column and the requirements of the control system to ensure the normal power supply and operation of the circuit. At the same time, it is also necessary to carry out grounding treatment to ensure that the metal components and the ground around the installation position can be connected with the grounding system of the lifting column to ensure the safety of the circuit and the lightning protection performance.
Start installation of lifting column 3. First of all, it is necessary to excavate the embedded foundation position, and carry out pile driving, concrete pouring and other processes. After the foundation is fixed, the bracket needs to be assembled and the automatic lifting column is installed on the bracket. When installing the lifting column, it is necessary to adjust the angle and height to ensure that the lifting column can enter and exit the embedded foundation completely. In addition, it is necessary to connect the cables and pipelines, and conduct debugging and trial operation to ensure their normal and safe operation.
4. acceptance and commissioning. After the installation is completed, strict testing and inspection are required to ensure the stable, flexible and safe operation of the lifting column. During the test, it is necessary to check the rising and falling speed, volume, force and other indicators of the lifting column, and adjust and optimize them. In addition, it is necessary to carry out actual use tests to check the practicability and reliability of the fully automatic lifting column, and whether it meets the specifications and user requirements to ensure that it can work normally.



 

 

 

Hebei Qi Xinlong Intelligent Technology Co., Ltd. is a research and development, design, production, sales and service in one of the anti-terrorism equipment manufacturers. Main products include:Fully automatic lifting column, stainless steel lifting column, semi-automatic lifting column, landscape fixed column, flap barricade, tire breaker, etc. Tel: 15531750999.

Key words:

Installation of automatic lifting column


©2022 Hebei Qi Xinlong Intelligent Technology Co., Ltd. All Rights Reserved